Kitchen Remodeling in Maryland, DC and Northern Virginia

All Purpose Anytime Services remodels kitchens in Bethesda, Silver Spring, Washington, DC, Arlington and the rest of the area within 30 miles of the Capitol. We run the whole kitchen as one job with one crew. Book a free walkthrough and the written scope and price reach you by text within 24 to 48 hours, before anything comes out.

What a kitchen remodel covers

In a kitchen every trade waits on the one before it. The plumber and electrician go first, then cabinets, counters and appliances, then the floor. We price it as one scope so you aren't lining up each trade yourself.

Layout and Appliances First

Where the sink, range and refrigerator go decides where water, gas and power have to run. We fix the layout and the appliance list with you before pricing, so the estimate covers the kitchen you will actually cook in.

Tear-Out and Wall Prep

Old cabinets, counters and finishes come out, and the walls behind them are straightened and patched so the new run hangs true and the counters sit flat.

Cabinets, Counters and Appliances

The new cabinets are set level and fastened into framing, the counters are measured from the installed boxes, and the appliances are set and connected at the end.

Plumbing and Electrical

Sink, dishwasher, range and lighting moved or added for the new layout, coordinated with licensed trades and the inspections your jurisdiction requires.

Floor Through the Room

The kitchen floor goes down after the heavy work, with a clean transition into the next room. Flooring is one of our own lanes, so it is not a separate contractor.

Finish and Punch List

Backsplash, trim, paint and hardware, then a walk of the kitchen with you and a list that gets finished before we call the job done.

Why homeowners hand us the whole kitchen

One Crew in Charge
Demolition, walls, cabinets, counters, floors and paint run in order under one contract, so the kitchen is not waiting on a trade you booked yourself.
A Price Before Demolition
A written scope and price before the first cabinet comes off the wall. Anything found behind it is priced and approved by you before the work goes on.
Licensed, Bonded & Insured
Home Improvement Contractor License No. 420226000078, with liability coverage on every kitchen we work in.
Kitchens in Our Gallery
The project gallery shows kitchens we have finished, from a quartz island kitchen to a sink run and island to an island set on new hardwood.

What makes a kitchen remodel run long

  • Choices Made After Demolition

    Cabinets, counters and appliances each take their own time to arrive, and a choice made after the old kitchen is gone holds up every trade behind it. Settling selections before the start date keeps the kitchen out of service for less time.

  • Walls That Are Not Flat

    Older walls bow and corners are rarely square. Cabinets hung on them show gaps and counters rock. Straightening the walls first is slower on day one and faster every day after.

  • What Was Under the Sink

    Old supply lines, a slow drip under the sink or a soft floor under the old cabinets show up at tear-out. We look for them on the walk, and you approve any change before it is made.

Why there's no kitchen price on this page

Two kitchens the same size can end up far apart once you've picked the cabinets, the counters and where the sink goes. So we measure your room and give you a free written estimate, and we don't put a number on the website.

It reaches you by text within 24 to 48 hours of the walkthrough, with the price and a link to approve it.

We're rated 5.0 on Google from four reviews. Both reviews on our homepage say we showed up on time, and one calls our prices fair and reasonable.

When the kitchen's done, we send one more text asking how we did.

Estimates Scheduled 7 Days A Week

Get a Free Kitchen Remodeling Quote

  • Free estimate, online or on site

Or call us directly:

(240) 695-4415

Tell Us About the Kitchen Remodeling Job

We take insurance jobs. Financing may also be available for qualifying projects. See financing options.

How a Kitchen Remodeling Job Runs

  1. 1Send photos of the kitchen and a note on what you want changed: layout, cabinets, appliances, floor.
  2. 2We measure the room, check what is behind the sink and under the old cabinets, and settle the layout with you.
  3. 3You get the scope and the price in writing, with the selections you need to make before the start date.
  4. 4Tear-out, wall prep and any plumbing and electrical moves happen first, then inspections where they apply.
  5. 5Cabinets, counters, floor, backsplash and appliances go in, and the punch list is finished before we leave.

Kitchen Remodeling Questions We Get Asked

What is the most expensive part of a house to remodel?

⌄
Of the rooms you already have, the kitchen, because cabinets, counters, appliances, plumbing, electrical, lighting and flooring all land in one room. An addition costs more than any remodel, since it also builds a foundation, walls and a roof. We do not publish kitchen prices. Your written estimate is free.

When remodeling a home, what should be done first?

⌄
Plan before anything is torn out: settle the layout, the appliance list and the budget, then the permit. On site the order is demolition, anything structural, then plumbing, electrical and heating rough-in, inspections, insulation and drywall, and the finishes last. Cabinets, counters and flooring go in after the dusty work is over.

What's the difference between remodel and renovation?

⌄
A renovation restores or refreshes what is there: new paint, new floors, new fixtures in the same places. A remodel changes the form of the room: a wall moves, the layout changes, the sink goes to a different wall. Most kitchen jobs are some of each, and the written scope says which parts are which.

How long does a home remodel take?

⌄
The scope sets it. Keeping the layout and swapping cabinets and finishes is the short version. Moving walls, plumbing or wiring adds permit review and inspections. Material lead times count too, and the written proposal includes the schedule.

How much does a kitchen remodel cost in Northern Virginia?

⌄
No neutral source publishes a Northern Virginia average. Our cost guide gives the nearest published figures, for DC and nationally, with their sources, and what moves a kitchen price in Arlington, Fairfax and Alexandria.

Read the full answer

How much does a kitchen remodel cost in Washington, DC?

⌄
Fixr puts the DC average at $35,775. Its range runs from $12,720 for a simple update to $318,000 for a luxury renovation, and permits add about $1,500. Angi's national average is $26,988, from 13,100 projects. Those are their numbers, not ours. We don't publish kitchen prices, and the written estimate after our walkthrough is free.

Can an FHA 203(k) loan pay for a kitchen remodel?

⌄
Yes. HUD's 203(k) loan rolls renovation into a purchase or refinance mortgage, and kitchen remodeling is on its list of eligible work. The Limited 203(k) covers smaller jobs with nothing structural. Structural work needs the Standard 203(k) and a HUD consultant. The money sits in escrow and pays the contractor in draws as the work is finished and inspected, and it all has to be done within six months of closing. We aren't enrolled in or approved by the program. Our part is the walkthrough, an itemized written estimate and, if you hire us, the kitchen.

Read the full answer

How much does a kitchen remodel cost?

⌄
Angi's national average is $26,988, and most people pay between $14,592 and $41,617. Angi sorts kitchens by how much changes: $10,000 to $20,000 for a minor remodel, $20,000 to $65,000 for a major one, and $65,000 to $130,000 or more for a complete new kitchen, with cabinets taking 40% or more of the budget. Fixr's Washington, DC average runs higher, at $35,775. Those are their figures, not ours. Whether the sink, range and walls stay where they are decides which tier your kitchen falls in, and the written estimate after our walkthrough is free.

How long does a kitchen remodel take from demolition to done?

⌄
It turns mostly on whether anything moves. Replacing cabinets, counters and finishes in the same layout is the short version. Moving the sink, the range or a wall adds rough-in work, inspections and patching, and the counters can't be templated until the cabinets are installed, which adds the fabrication wait. Your schedule is in the proposal, and we tell you when a delivery moves it.

What is the order of steps in a kitchen remodel?

⌄
Layout and selections first, then protection and tear-out. Any wall or framing changes come next, then plumbing and electrical rough-in and their inspections, then drywall, patching and primer. Cabinets are set, the counters are templated from the installed boxes, and then the floor, backsplash, sink, appliances and trim go in. The punch list closes the job.

Do I need permits for a kitchen remodel in Washington DC?

⌄
Yes if you move plumbing, wiring, gas or a wall. Those need a permit from the DC Department of Buildings, with trade permits alongside it. Swapping cabinets and counters in the same spots with no new circuits generally doesn't need a building permit, though a condo board usually wants its own approval either way. We pull the permits for our scope and manage the inspections.

Read the full answer

Can I use my kitchen during a remodel?

⌄
Not for most of it. Once the sink and counters come out you've lost running water and a work surface until the new ones are in. Set up a station in another room with the refrigerator, a microwave and a kettle, and wash up in the bathroom. Making every selection before demolition is what shortens that stretch the most.

How far ahead should I book a kitchen remodel contractor?

⌄
Early enough that cabinets can be ordered before demolition. Lead times on cabinets, counters and appliances set the start date more than a crew schedule does, and a layout change adds permit review. Get the walkthrough done first. The written estimate arrives by text within 24 to 48 hours of it, and the start date follows from your selections.

Is a partial kitchen remodel worth it or should I do the whole kitchen?

⌄
A partial remodel is worth it when the layout works and one or two things are worn out, such as the counters, the floor or the appliances. Do the whole kitchen when the new pieces have to fit old ones that are also near the end. New stone on tired cabinets, or new cabinets beside old counters, often leads to a second job. Angi puts a minor remodel at $10,000 to $20,000 nationally and a major one at $20,000 to $65,000.

What kitchen upgrades add the most resale value?

⌄
We don't have resale data of our own. Remodeling magazine's yearly Cost vs. Value report has long shown a minor kitchen remodel getting back a bigger share of its cost at sale than a major upscale one. Buyers notice worn counters, dated doors, an old floor and appliances that don't match, so a modest refresh tends to recover more than custom work. If you're staying for years, build the kitchen you cook in.

Open concept kitchen or keep the walls, what do most people choose?

⌄
We don't keep a count, so we can't tell you what most people pick. We can tell you what decides it in your house. If the wall carries load, taking it out means a beam, and it can move ductwork, wiring or a plumbing vent. An open kitchen also sends cooking smells and noise into the living room, and a kept wall gives you more cabinet space. We check whether the wall is load bearing on the walkthrough.

Why do kitchen remodels take longer than the contractor said?

⌄
The usual causes are choices made after demolition, cabinets or counters that arrive late, walls that need straightening before cabinets hang true, and something found under the old sink. A schedule that assumed none of those was optimistic. We ask for selections before the start date and look under the sink and the old cabinets on the walkthrough, so fewer surprises turn up halfway.

What are the most common kitchen remodel mistakes?

⌄
Tearing out before cabinets and appliances are chosen and ordered. Picking appliances after the cabinets, so an opening ends up the wrong size. Too little counter beside the range and sink. Hanging cabinets on walls that aren't flat. Forgetting light over the counters. Most come from planning in the wrong order, which is why we settle the layout and the appliance list before pricing.

What hidden problems show up once kitchen walls are opened?

⌄
Old supply lines and slow leaks under the sink, soft subfloor under the old cabinets, wiring that has to be brought up to code once circuits are added, and in older houses plaster and lath where you expected drywall. We look for the outside signs on the walkthrough. Anything found after tear-out is photographed, priced and approved by you before we go on.

How do I handle a kitchen remodel that is going wrong?

⌄
Write to the contractor with photos, point to the scope and contract, and ask for a corrected schedule and a list of what will be fixed. Don't pay ahead of finished work while it's sorted out. In Maryland the Home Improvement Commission takes complaints, and in DC the Attorney General's consumer protection office does. If you part ways, a new contractor will need the permit status and a record of what was paid.

How do I verify a kitchen remodel contractor is licensed and insured?

⌄
For the license, search SCOUT in DC, or the Maryland Department of Labor's license search for a Maryland Home Improvement Commission license. For insurance, ask for a current certificate showing general liability and workers' compensation, and call the carrier listed if you want to be sure. We send our certificate on request, and our Home Improvement Contractor License is No. 420226000078.

What should a kitchen remodel contract include?

⌄
The scope, the price, a payment schedule tied to stages, the start date, who pulls the permits, which cabinets, counters and appliances are included or allowed for, how changes are priced and approved, the warranty and the contractor's license number. In DC a licensed home improvement contractor has to give you the contract in writing. Our estimates set out the scope, price, payment schedule and warranty before you sign.

How many kitchen remodels should a contractor have done before I trust them?

⌄
There's no magic number, and we don't publish a count of our own. Ask to see finished kitchens like yours, ideally with photos from before the counters went in, and talk to one or two of the owners. Our gallery shows three kitchens we finished, among them a quartz island kitchen and an island set on new hardwood, and our Google rating is 5.0 from four reviews.

My kitchen remodel is half finished and the contractor stopped showing up. What now?

⌄
Send the contractor written notice with a date to come back, keep copies of the contract and every payment, and photograph where the work stands. Check whether the permit is still open and which inspections passed. Then get the rest priced. We walk half-finished kitchens, write a scope for what's left and tell you plainly if anything already installed has to come out.

A pipe burst in my kitchen and the cabinets are ruined. Who remodels after water damage?

⌄
We do. Shut off the water first and call your insurer. Water damage reconstruction is one of our lanes, so we document the damage, dry the room or check the mitigation company's readings, and rebuild the kitchen from the subfloor and walls to new cabinets, counters and floor. If you wanted to change the kitchen anyway, the upgrade is priced apart from what the claim covers.

Read the full answer