All Purpose Anytime Services remodels kitchens in Bethesda, Silver Spring, Washington, DC, Arlington and the rest of the area within 30 miles of the Capitol. We run the whole kitchen as one job with one crew. Book a free walkthrough and the written scope and price reach you by text within 24 to 48 hours, before anything comes out.
What a kitchen remodel covers
In a kitchen every trade waits on the one before it. The plumber and electrician go first, then cabinets, counters and appliances, then the floor. We price it as one scope so you aren't lining up each trade yourself.
Layout and Appliances First
Where the sink, range and refrigerator go decides where water, gas and power have to run. We fix the layout and the appliance list with you before pricing, so the estimate covers the kitchen you will actually cook in.
Tear-Out and Wall Prep
Old cabinets, counters and finishes come out, and the walls behind them are straightened and patched so the new run hangs true and the counters sit flat.
Cabinets, Counters and Appliances
The new cabinets are set level and fastened into framing, the counters are measured from the installed boxes, and the appliances are set and connected at the end.
Plumbing and Electrical
Sink, dishwasher, range and lighting moved or added for the new layout, coordinated with licensed trades and the inspections your jurisdiction requires.
Floor Through the Room
The kitchen floor goes down after the heavy work, with a clean transition into the next room. Flooring is one of our own lanes, so it is not a separate contractor.
Finish and Punch List
Backsplash, trim, paint and hardware, then a walk of the kitchen with you and a list that gets finished before we call the job done.
Why homeowners hand us the whole kitchen
- One Crew in Charge
- Demolition, walls, cabinets, counters, floors and paint run in order under one contract, so the kitchen is not waiting on a trade you booked yourself.
- A Price Before Demolition
- A written scope and price before the first cabinet comes off the wall. Anything found behind it is priced and approved by you before the work goes on.
- Licensed, Bonded & Insured
- Home Improvement Contractor License No. 420226000078, with liability coverage on every kitchen we work in.
- Kitchens in Our Gallery
- The project gallery shows kitchens we have finished, from a quartz island kitchen to a sink run and island to an island set on new hardwood.
What makes a kitchen remodel run long
Choices Made After Demolition
Cabinets, counters and appliances each take their own time to arrive, and a choice made after the old kitchen is gone holds up every trade behind it. Settling selections before the start date keeps the kitchen out of service for less time.
Walls That Are Not Flat
Older walls bow and corners are rarely square. Cabinets hung on them show gaps and counters rock. Straightening the walls first is slower on day one and faster every day after.
What Was Under the Sink
Old supply lines, a slow drip under the sink or a soft floor under the old cabinets show up at tear-out. We look for them on the walk, and you approve any change before it is made.
Why there's no kitchen price on this page
Two kitchens the same size can end up far apart once you've picked the cabinets, the counters and where the sink goes. So we measure your room and give you a free written estimate, and we don't put a number on the website.
It reaches you by text within 24 to 48 hours of the walkthrough, with the price and a link to approve it.
We're rated 5.0 on Google from four reviews. Both reviews on our homepage say we showed up on time, and one calls our prices fair and reasonable.
When the kitchen's done, we send one more text asking how we did.
Get a Free Kitchen Remodeling Quote
- Free estimate, online or on site
Or call us directly:
(240) 695-4415Tell Us About the Kitchen Remodeling Job
We take insurance jobs. Financing may also be available for qualifying projects. See financing options.
How a Kitchen Remodeling Job Runs
- 1Send photos of the kitchen and a note on what you want changed: layout, cabinets, appliances, floor.
- 2We measure the room, check what is behind the sink and under the old cabinets, and settle the layout with you.
- 3You get the scope and the price in writing, with the selections you need to make before the start date.
- 4Tear-out, wall prep and any plumbing and electrical moves happen first, then inspections where they apply.
- 5Cabinets, counters, floor, backsplash and appliances go in, and the punch list is finished before we leave.
Kitchen Remodeling Questions We Get Asked
What is the most expensive part of a house to remodel?
⌄
When remodeling a home, what should be done first?
⌄
What's the difference between remodel and renovation?
⌄
How long does a home remodel take?
⌄
How much does a kitchen remodel cost in Northern Virginia?
⌄
How much does a kitchen remodel cost in Washington, DC?
⌄
Can an FHA 203(k) loan pay for a kitchen remodel?
⌄
How much does a kitchen remodel cost?
⌄
How long does a kitchen remodel take from demolition to done?
⌄
What is the order of steps in a kitchen remodel?
⌄
Do I need permits for a kitchen remodel in Washington DC?
⌄
Can I use my kitchen during a remodel?
⌄
How far ahead should I book a kitchen remodel contractor?
⌄
Is a partial kitchen remodel worth it or should I do the whole kitchen?
⌄
What kitchen upgrades add the most resale value?
⌄
Open concept kitchen or keep the walls, what do most people choose?
⌄
Why do kitchen remodels take longer than the contractor said?
⌄
What are the most common kitchen remodel mistakes?
⌄
What hidden problems show up once kitchen walls are opened?
⌄
How do I handle a kitchen remodel that is going wrong?
⌄
How do I verify a kitchen remodel contractor is licensed and insured?
⌄
What should a kitchen remodel contract include?
⌄
How many kitchen remodels should a contractor have done before I trust them?
⌄
My kitchen remodel is half finished and the contractor stopped showing up. What now?
⌄
A pipe burst in my kitchen and the cabinets are ruined. Who remodels after water damage?
⌄