Resource Center

Answers Organized Around
What You're Trying To Do

These are the questions people ask us most about claims, build-outs, remodel pricing and rental portfolios, grouped by the division that handles each one.

Division 01

Property Restoration & Insurance Claims

What happens after the loss, from the first call and the adjuster's visit to the day the property is back to pre-loss condition.

What happens after I file an insurance claim?+
The insurer's adjuster inspects and writes a scope of loss, and that scope becomes your rebuild budget. We meet the adjuster, photograph everything and flag what is easy to miss, like subfloor, insulation and hidden structural damage. Then we rebuild to the approved scope and file supplements for damage found during the work.
Can I choose my own contractor, or do I have to use the insurance company's?+
In almost every case you have the right to choose your own contractor. Insurers may recommend a "preferred" vendor, but you are not obligated to use them. Choosing your own contractor means someone working for your interests, making sure the scope is complete and the work is done to your standard, not just to the lowest number.
What does insurance typically cover after water damage?+
Most policies cover sudden, accidental water damage (a burst pipe, an overflow, a failed water heater), including demolition, drying and the rebuild to pre-loss condition. Gradual leaks and flood water are often treated differently, so the cause of loss matters. We document the cause and the full scope so nothing eligible is left off.
How long does a restoration rebuild take?+
One water-damaged room may take a week or two after dry-out. A whole-home fire rebuild can run several months. The claim and supplement process is usually the bigger variable than the construction. One project manager stages the trades so drywall, paint, flooring and trim run without gaps.
Division 02

Commercial Construction

How build-outs, tenant improvements and renovations come together on a real-estate timeline.

What is a tenant improvement (TI)?+
The interior construction that turns a shell or existing suite into a usable space: partitions, finishes, lighting, flooring and MEP coordination. It is usually tied to a lease, sometimes a landlord allowance, and a delivery date. We build to the lease scope and coordinate inspections so the space opens on time.
What goes into an office renovation planning checklist?+
Set the goal (headcount, layout, brand), then check the building: existing MEP, ceiling heights, egress and ADA. Then scope and budget, permit drawings, a phasing plan if the space stays occupied, and a schedule with long-lead doors, glass and millwork ordered early. We pressure-test the scope before work starts.
How long does a commercial renovation take?+
A straightforward office or retail refresh can be a few weeks. A full build-out with permits, custom millwork, and MEP work typically runs one to three months. Permitting and material lead times drive the schedule more than the construction itself, which is why we identify long-lead items and permit requirements at the very start.

Residential Remodeling

What drives the cost of the home projects people ask us about most, and how they get planned.

How much does it cost to finish a basement?+
Size, finish level and whether you add a bathroom or kitchenette set the cost. Framing, insulation, drywall, flooring, paint and lighting is the low end. An egress window, full bath, wet bar or legal apartment raises it. A walkthrough gets you an itemized estimate you can phase.
How do I plan a kitchen remodel?+
First decide whether the layout stays or the plumbing and electrical move. That choice drives most of the budget. Then pick cabinets, counters and appliances early, since they have the longest lead times. We run demolition, framing or MEP changes, cabinets, counters, backsplash, flooring and paint on one schedule.
What should I know before a bathroom renovation?+
Bathrooms are small but trade-dense, demo, plumbing, waterproofing, tile, electrical, and finish all happen in a tight space, so sequencing matters. Waterproofing behind tile is where corners get cut and problems start years later. We do it right. Expect a well-run full bathroom remodel to take one to three weeks depending on tile scope and fixture lead times.

Roofing & Exterior

Storm damage, insurance roof claims, and knowing when a repair is enough versus a full replacement.

What is on a storm damage checklist?+
Photograph everything before touching it (lifted or missing shingles, dented gutters and flashing, interior stains) and note the storm date. A written roof inspection with photos is what supports the claim, and active leaks get tarped. We do the inspection, documentation and tarping in one visit.
How does an insurance roof claim work?+
You file, an adjuster writes a scope, and covered damage is approved for repair or replacement to that scope. A photo-backed inspection report is what gets the full damage recognized. We meet the adjuster, document the damage and build to the approved scope, with supplements for damage found under the old roof.
What are the signs I need a roof replacement?+
A few missing shingles is usually a repair. Widespread curling, granules in the gutters, daylight or stains in the attic, sagging, or a roof past 20-25 years points to replacement. An inspection tells you which, without defaulting to the bigger job.
Division 05

Facility Maintenance & Capital Improvements

For property managers and portfolio owners weighing recurring maintenance against planned capital projects.

What is the difference between maintenance and a capital improvement?+
Maintenance keeps a property as it is (repairs, unit turns, touch-ups) and is usually expensed. A capital improvement adds value or extends life (a new roof, a common-area renovation, a systems upgrade) and is budgeted and depreciated. One vendor for both keeps turns and big projects on the same standards.
How do unit turns work for a portfolio?+
A unit turn is the make-ready between tenants: paint, patch, fixture and hardware repair, flooring touch-up, and cleaning so the unit re-lists fast. The value is speed and consistency across the portfolio, a standard scope and a crew that can scale to hit tight turnover windows. We run turns to a repeatable checklist so every unit meets the same standard.
Why use one vendor across a whole portfolio?+
One vendor means one point of contact, consistent quality standards, predictable pricing, and a partner who already knows your buildings. It also balances your spend, recurring maintenance provides steady cash flow while larger CapEx projects are planned around it, instead of chasing a new contractor for every job.