Skip to main content
Tiled walk-in shower built by All Purpose Anytime Services with white subway tile, a penny-round mosaic floor and a grab bar
SINCE 2020
5.0 on Google · 4 reviews

Bathroom Remodeling in Maryland, DC and Northern Virginia

All Purpose Anytime Services remodels bathrooms in Silver Spring, Washington, DC, Fairfax, Alexandria and the rest of the area within 30 miles of the Capitol. We redo the bathroom from the waterproofing up. After a free walkthrough you get one written price by text within 24 to 48 hours, before demolition.

What a bathroom remodel covers

Water is what ruins a bathroom, so most of our care goes where you'll never see it, behind the shower walls, under the floor and at the drain. The tile and fixtures go on top of that.

Tub or Shower

Replace the tub, swap a tub for a shower, or rebuild the shower you have, set on a pan that slopes to the drain so water never sits.

Waterproofing First

Cement board and a waterproof layer go behind every wet wall before any finish. A failure there leaks inside the wall, where nobody notices until the damage is done.

Vanity, Toilet and Fixtures

Vanity, sink, faucet, toilet, mirror and accessories replaced in place, or moved where the plumbing under the floor allows it.

Floors and Walls

The subfloor is checked for soft spots from old leaks and repaired before the new floor goes down, so the finish sits on something solid.

Fan, Light and Power

A fan vented outside rather than into the attic, light where you stand at the mirror, and GFCI protection at the outlets, coordinated with licensed trades.

Grab Bars and Safer Access

Blocking goes into the wall before the board, so a grab bar added now or years from now is fastened into wood instead of drywall.

Why one contractor should do the whole bathroom

One Written Price
The scope and the price in writing before demolition. If the old floor or wall hides a problem, you see it and approve the fix before we go on.
Licensed, Bonded & Insured
Home Improvement Contractor License No. 420226000078, with liability coverage on every bathroom job.
We Rebuild After Leaks
Water damage reconstruction is part of what we do, so rot found under an old tub is repaired by the same crew. Nobody hands it off to another company.
A Bathroom in Our Gallery
The project gallery shows a tiled walk-in shower we built, with the blocking, the waterproofing and the grab bar described step by step.

Bathroom problems a remodel should fix

  • A Soft Floor by the Toilet or Tub

    A floor that gives underfoot near the toilet or tub usually means water has been reaching the subfloor. It gets cut out and replaced during the remodel, not covered over.

  • Peeling Paint and a Mirror That Never Clears

    Paint lifting off the ceiling and a fogged mirror long after a shower point to a fan that is missing, too small or venting into the attic. A remodel is the time to fix the venting, not just repaint.

  • Cracked Grout and Loose Tile

    Tile cracks and grout falls out when the floor or wall underneath moves. New tile over the same movement cracks the same way, so the movement is fixed first.

How a bathroom job starts

We price a bathroom from a walkthrough, never from a price list. We don't have remodel prices on record, and a new vanity in place and a gut to the studs aren't the same job anyway.

We're open 7 AM to 7 PM every day and we don't run an emergency service. If your message comes in after 7 PM, we answer it the next morning.

The work runs under our Washington, DC residential license, our Washington, DC contractor license and our Maryland contractor license.

After the visit you'll get a text saying the estimate is on its way. It lands within 24 to 48 hours.

Estimates Scheduled 7 Days A Week

Get a Free Bathroom Remodeling Quote

  • Free estimate, online or on site

Or call us directly:

(240) 695-4415

Tell Us About the Bathroom Remodeling Job

We take insurance jobs. Financing may also be available for qualifying projects. See financing options.

How a Bathroom Remodeling Job Runs

  1. 1Send photos of the bathroom and tell us what bothers you about it, from the shower to the fan.
  2. 2We look at the floor around the toilet and tub for soft spots and check where the fan vents.
  3. 3You get a written scope and price before demolition, and a plan for the days the room is out of use.
  4. 4The room is stripped, any rot is repaired, and blocking and waterproofing go in before the finishes.
  5. 5Shower, floor, vanity, toilet, fan and lighting are set, every joint is checked, and the room is handed back clean.

Bathroom Remodeling Questions We Get Asked

Can you redo a bathroom for $10,000?

⌄
It depends on the redo: new vanity, toilet, fixtures and finishes in place costs far less than gutting to the studs or moving the shower drain. We do not publish bathroom prices. Send your budget and the free written estimate shows what fits inside it.

Can you live in your house during a remodel?

⌄
Usually, yes. The work area is closed off with dust containment and a clear path is kept through the house. If the bathroom being remodeled is your only one, we plan around that with you before the start date.

How long does a renovation usually take?

⌄
It depends on the size of the job, how long the permit takes in your jurisdiction, and when the materials you pick arrive. Swapping fixtures in place is a short job. Moving plumbing or anything that needs a permit takes longer. You get a schedule with the written proposal, and we tell you when something moves.

How much does a bathroom remodel cost in Washington DC?

⌄
Fixr puts a full bathroom remodel in Washington, DC at an average of $19,080, with most between $11,925 and $31,800. Angi's DC figure is lower, $7,080 to $18,260 with an average of $12,651. Those are market estimates, not our prices. We don't publish bathroom prices, and the written estimate after our walkthrough is free.

What does a small bathroom remodel cost compared to a primary bathroom?

⌄
Fixr's Washington, DC averages run $6,559 for a powder room, $7,553 for a half bath, $19,080 for a full bath and $42,135 for a master bath. The primary bath usually has a separate shower and tub, two sinks and far more tile, and that's where the difference comes from.

What part of a bathroom remodel costs the most?

⌄
Labor, in most bathrooms. Angi puts labor at 40% to 60% of a bathroom budget in the DC area, and older rowhouses with tight stairs push it higher. Among materials the shower is usually the biggest line, especially a tiled one with a built pan and glass. Moving the toilet or shower drain adds plumbing and floor work on top.

How much extra does it cost to move a toilet or shower to a new spot?

⌄
Fixr's national plumbing guide puts moving a toilet at $200 to $400 for the plumbing itself, and Fixr notes there's no added cost when the layout stays. The pipe is only part of it. The floor has to be opened, the drain needs slope to the stack and a vent, and the floor and tile are rebuilt over it. A move along the joists is far simpler than one across them or through a concrete slab.

How long does a bathroom remodel take?

⌄
A fixture and finish swap in the same layout is a short job. A gut to the studs with a new tiled shower takes longer, because waterproofing, thinset and grout need drying time that can't be rushed, and moved plumbing adds a permit and inspection. The schedule comes in writing with the proposal, along with the plan for the days the room is out of use.

What are the steps of a bathroom remodel in order?

⌄
Demolition, then repairs to any rotted subfloor or framing. Plumbing and electrical rough-in come next, inspected where a permit applies, then blocking for grab bars, cement board and the waterproof layer. Tile goes on after that, then the vanity, toilet, fixtures, fan, lighting and paint. Every joint is checked before the room is handed back.

Do I need a permit for a bathroom remodel?

⌄
Usually, once the plumbing, wiring or walls change. DC's Department of Buildings counts new plumbing fixtures as permit work, and its plumbing, electrical and mechanical permits are issued only to licensed master trade professionals, never to the homeowner. Montgomery County files a kitchen or bath renovation under an alteration building permit. Fairfax County lists bathroom remodels as work that needs a permit, while swapping a vanity or countertop, replacing tile, new flooring and paint do not. We pull the permits for our scope and book the inspections.

Do I need a permit to remodel a bathroom in Maryland?

⌄
Yes if you move or add plumbing, wiring or a fan duct. The permit comes from your county, or the city in places like Rockville: DPIE in Prince George's, the Department of Permitting Services in Montgomery, or Planning and Growth Management in Charles. A cosmetic update with fixtures in the same places generally needs no building permit. We check your county's rules before pricing.

Read the full answer

Can a bathroom remodel be done in stages?

⌄
Some of it can. The vanity, toilet, lighting and paint can each be done on their own. The shower, its waterproofing and the floor tile belong in one stage, because cutting into a finished waterproof layer later leaves a seam where water gets in. If the budget forces stages, do the wet area first and the finishes after.

What fixtures should I buy before the remodel starts?

⌄
Anything the plumbing has to fit: the shower valve, the tub or shower base, the toilet for its rough-in distance, and the vanity and faucet. The valve and base fix where pipes and drains go, so they're needed at rough-in, well before the trim goes on. Order them before demolition so a backorder doesn't leave a bathroom open. Tile, mirror and accessories can follow.

Reglazing a tub or replacing it, which lasts longer?

⌄
Replacing it. Reglazing sprays a new coating over the old surface, and that coating wears and peels sooner than original porcelain or a new tub, especially with abrasive cleaners. Reglaze a sound cast iron tub you want to keep, or one you're tidying up before a sale. Replace it when the tub is cracked, the tile around it is failing too, or you want a shower instead.

Is a bathroom remodel worth it before selling a house?

⌄
A full remodel rarely pays for itself at sale. Fixing what a buyer or inspector will flag usually does: a soft floor by the toilet, cracked grout, a fan that doesn't vent outside, a vanity that's falling apart. Make the bathroom clean, dry and working, and leave the tile choice to the next owner.

What bathroom features help with aging in place?

⌄
Grab bars fastened into blocking, a curbless or low-curb shower, a handheld shower head on a slide bar, a comfort height toilet, a slip-resistant floor and a door wide enough for a walker. Lever handles help hands that don't grip well. The cheapest step is adding blocking in the walls during any remodel, so a grab bar can go up later into solid wood.

What damage hides behind bathroom walls during a remodel?

⌄
Rotted subfloor around the toilet and tub, wet board behind tile that was set on plain drywall, failed shower pans, old galvanized pipe, and mold where the fan vented into the attic or nowhere. We check the floor near the toilet and tub and where the fan vents on the walkthrough. Anything found after demolition is shown to you and priced before we fix it.

Why do bathroom remodel quotes change after demolition?

⌄
The walls and floor were closed when the job was priced. Rot under the tub, a cracked pan or old pipe only shows once the tile is off. A fair quote says what it assumes about the hidden parts and how a change will be handled. With us, anything found is photographed, priced and approved by you before the work goes on.

What do I do if my bathroom remodel leaks after it is done?

⌄
Stop using that fixture, note where the water shows up, and tell the contractor who built it, in writing with photos. Leaks after a remodel usually come from a supply connection, the drain or the shower pan. Our labor carries a 60 to 90 day warranty from completion, depending on the job, and if a leak comes from how we did the work, we come back and fix it at no charge.

Read the full answer

The tile in my shower is falling off the wall. What is going on behind it?

⌄
Usually water. Tile lets go when the board behind it gets wet, often plain drywall or greenboard with no waterproof layer, and by then it's soft or crumbling. Sometimes the wall moved or the thinset never bonded. Gluing the tiles back won't hold. The wall has to be opened to see how far the water went, and rebuilt with cement board and a waterproof layer before new tile.

How do I check a bathroom contractor's license in Washington DC?

⌄
Look the business up on SCOUT, the DC Department of Licensing and Consumer Protection's search, and confirm a Home Improvement Contractor or General Contractor license. The plumber and electrician on your bathroom need their own DC trade licenses. We hold a DC residential license and a DC contractor license, and our Home Improvement Contractor License is No. 420226000078.

What should be in writing before a bathroom remodel starts?

⌄
The scope, including whether the subfloor and wall board are replaced and what waterproofing goes behind the tile. The price and payment schedule. Which tile, fixtures and vanity are included and who supplies them. The plan for the days the room is out of use, how changes are handled, and the warranty. We put the scope and price in writing before demolition.

Should I ask for photos of a contractor's finished bathrooms?

⌄
Yes, and ask for photos from during the job as well. Finished tile looks good in any picture. The board, waterproofing and blocking behind it decide whether it lasts. Our gallery shows a walk-in shower we built, with the blocking, the waterproofing and the grab bar described step by step.

My only bathroom is torn apart and the contractor quit. How fast can someone finish it?

⌄
We can't promise a date before we've seen it, and we don't offer same-day starts. Send photos and we'll book the walkthrough. The written estimate follows by text within 24 to 48 hours. The finish date depends on whether the fixtures are on hand, whether the open work passed inspection and what has to be redone, and we'll plan with you how to get a working toilet back first.

My shower is leaking into the ceiling below. Who can fix and remodel it?

⌄
We can do both the shower and the ceiling. Stop using the shower, and shut its supply if water is still dripping. The leak is usually the pan, the drain or the valve, and finding it often means opening the shower floor or wall. We rebuild the shower over a proper waterproof layer, then replace the wet ceiling below once it reads dry.

Read the full answer