Home Additions in Maryland, DC and Northern Virginia

All Purpose Anytime Services is a licensed contractor that builds home additions in Washington, DC and the Maryland and Northern Virginia suburbs within 30 miles of it. We add the bedroom, family room, bigger kitchen or suite onto the house you have, footing to paint, and after a free walkthrough the written price reaches you by text within 24 to 48 hours.

What a home addition covers

There's the new structure, the place where it joins the house, and the finished room inside. It all goes on one scope, and one person answers for it.

Planning the Room First

What the room is for decides its size, where the doorway from the house lands, where the windows go and how the new roof meets the old one. We settle that with you before pricing, so the number is for the room you actually want.

Footing and Framing

The new room sits on its own footing and is framed to the floor height of the house, so you step through the opening without a ramp or a lip.

Roof Tie-In and Weathering In

Where the new roof meets the old one is where additions leak. The tie-in, the flashing and the siding joint get the most attention, and the shell is closed to the weather before the inside work starts.

Opening Into the House

An outside wall becomes an inside one. The opening gets a proper header, the old siding and sheathing come out, and the dust stays on the addition side while you live in the rest of the house.

Systems Carried Across

Outlets, lighting, heating and cooling, and water if the room needs it, extended from the house and coordinated with licensed trades and the inspections the jurisdiction requires.

Finished to Match

Insulation, drywall, trim, flooring and paint finished so the new room reads as part of the house rather than something bolted on, with the floor carried through the opening where the material allows.

Why one contractor should build the whole addition

One Scope, One Price
Footing to paint on one written scope and one price before work starts. If opening the old wall changes the scope, you hear about it and approve it first.
Licensed, Bonded & Insured
Home Improvement Contractor License No. 420226000078, with residential and contractor licensing in Washington, DC and Maryland.
Permits Handled
An addition needs a building permit. We identify what yours needs and coordinate permitting and inspections in Maryland, DC and Virginia.
A Free Written Estimate
We walk the lot and the side of the house the addition would join, then put the scope and the price in writing at no cost to you.

Where home additions go wrong

  • The Roof Joint Leaks

    Most addition leaks start where the new roof meets the old one, or where new siding butts the old. That joint is flashed and checked before the inside is closed up, because a leak there shows up months later as a stain on a brand new ceiling.

  • The Floors Do Not Line Up

    An addition framed a little high or low leaves a step at the opening. Setting the new floor height from the existing house, not from the ground outside, is what keeps the transition flat.

  • The Old House Was Not Ready

    A panel with no room for new circuits, or heating that cannot reach one more room, turns a simple addition into a bigger one when it is found late. We look at both on the first walk and price them up front.

How an addition gets priced here

We don't price an addition until we've stood on the lot and looked at the wall it would tie into. You'll have the written number within 24 to 48 hours of that visit. There's no addition price on this site because we don't have one we'd stand behind without seeing the house.

When you book, you get a text with the date, the time and the address. The estimate comes the same way, with the price and a link to approve it.

We work within 30 miles of Washington, DC.

Estimates Scheduled 7 Days A Week

Get a Free Home Additions Quote

  • Free estimate, online or on site

Or call us directly:

(240) 695-4415

Tell Us About the Home Additions Job

We take insurance jobs. Financing may also be available for qualifying projects. See financing options.

How a Home Additions Job Runs

  1. 1Tell us what the new room is for and roughly where on the house you picture it, with photos of that side if you have them.
  2. 2We walk the lot and the wall the addition would join, and look at the electrical panel and the heating while we are there.
  3. 3You get a written scope and price, plus what the permit will need, before anything is ordered.
  4. 4Footing, framing and roof go up and the shell is closed to the weather before the old wall is opened.
  5. 5Systems, insulation, drywall, flooring and paint finish the room, and we walk it with you against the scope.

Home Additions Questions We Get Asked

Is it cheaper to remodel a house or build a new one?

⌄
Usually remodeling or adding on costs less than building new, because the land, the existing foundation, the utility connections and most of the structure are already paid for. Building new starts to make sense when the structure itself has to come down. We do not publish a per-square-foot price. The free written estimate prices your addition against your house.

What is the 30% rule in remodeling?

⌄
A rule of thumb, not a code: keep a remodel or addition at or under roughly 30 percent of the house's value, so you do not spend more than the neighborhood gives back at sale. If you are staying for years, how the house works for you can matter more.

Do you pull permits?

⌄
An addition needs a building permit. We identify what yours requires and coordinate permitting and inspections in Maryland, DC and Virginia, and in DC we manage the submission for you.

Read the full answer

Do I need a permit for a detached garage in Maryland?

⌄
Check before you build. In Maryland the permit office is the county's, or the city's in places like Rockville: DPIE in Prince George's, the Department of Permitting Services in Montgomery and Planning and Growth Management in Charles. That office decides whether your garage needs a permit and what the plans must show.

Read the full answer

How much does a home addition cost in Maryland?

⌄
The published figures are Baltimore and statewide estimates per square foot, and they leave out plans, engineering and permits. Our cost guide lists them with their sources and explains what sets the price of an addition in Maryland.

Read the full answer

How much does a home addition cost?

⌄
Angi puts a home addition at $100 to $300 per square foot building out in Washington, DC, and $80 to $200 in Baltimore, with building up costing far more in both markets. Those are market estimates, not our price, and a per-foot number leaves things out: CostFlow's Maryland calculator keeps drawings, engineering and permit fees outside its base figure. An extension and an addition are the same job. Its size, what the room is for, how it meets the old roof and which systems it needs set the price, and our cost guide lists every published figure with its source.

Read the full answer

Do I need a permit for a home addition?

⌄
Yes, in every jurisdiction we work in. In DC the Department of Buildings issues an addition, alteration and repair permit for any increase in a building's floor area, height or stories, and every addition application includes a surveyor's plat of the existing and proposed structure. Its Homeowner's Center takes the simplest ones: a single-family addition of up to 500 square feet, one story at ground level, with no party wall and no exterior or load-bearing wall removed. In Maryland the county permit office issues it, and in Fairfax County you apply online through Land Development Services. We coordinate the permits and inspections for our scope.

How much does a home addition cost in Washington DC?

⌄
Angi's Washington, DC page puts a home addition at $100 to $300 per square foot building out and $400 to $800 per square foot building up. Those are Angi's market estimates, not our price. In the District the rowhouse lot, a party wall and historic review often decide which of the two an addition can even be, so we price yours in writing after walking the lot.

How long does it take to build a home addition from start to finish?

⌄
Longer than the construction alone, because design and the permit come first and nothing is dug until both are done. After the permit, the build runs footing, framing, roof, the rough-ins and their inspections, then insulation, drywall and finishes. We don't publish a standard timeline. Your schedule is written into the proposal, and we tell you when a permit review or a delivery moves it.

What are the steps in building a home addition, from design to final inspection?

⌄
Decide what the room is for, get drawings, get the permit, then build. The footing and foundation go in, then framing, the roof and its tie-in to the old roof, and windows and siding to close the shell. Electrical, plumbing and HVAC are roughed in and inspected before insulation and drywall. Flooring, trim and paint follow, the old wall is opened into the new room, and the final inspection closes the permit.

Do I need an architect before I talk to a contractor about an addition?

⌄
No. Talk to the contractor first. A walk of the lot tells you early whether the room you're picturing fits the setbacks, the roofline and your budget, and that's cheaper to learn before you pay for drawings. Most additions still need drawings the permit office will accept, and an engineer where the structure calls for one, so those come next, shaped by what the walkthrough found.

What permits does a home addition need in Washington DC?

⌄
A building permit from the DC Department of Buildings, with electrical, plumbing and mechanical permits for the trades that run into the new room. In a historic district the exterior design goes through historic review before the permit, and the zoning rules decide how close to the lot lines you can build. We pull the permits for our scope and manage the inspections.

Read the full answer

Can I live in my house while an addition is being built?

⌄
Usually, yes, because most of the work happens outside until the old wall is opened. The days to plan around come after the opening is cut, when there's dust and noise and a sealed plastic wall between you and the new room. If the addition changes your kitchen or your only bathroom, we plan those days with you before the start date.

When is the best time of year to start a home addition in the DMV?

⌄
Start the paperwork in late fall or winter so the permit is issued and digging starts in spring, when the ground isn't frozen and the shell goes up in drier months. Weather matters most for the footing, the framing and the roof. Once the addition is closed in, the inside work carries on in any season.

Why do home addition projects go over budget so often?

⌄
Usually something was left off the first price: the drawings and engineering, the permit fees, an electrical panel with no room for new circuits, heating that can't reach one more room, or a finish chosen late. CostFlow's Maryland calculator leaves permits and plans out of its base figure too. We look at the panel and the heating on the first walk so they're lines in the estimate, and if opening the old wall changes the work, you approve the change before we do it.

What are the most common problems people run into with home additions?

⌄
Leaks where the new roof meets the old one, a step at the doorway because the new floor was framed from the ground and not from the house, and an old house that can't carry the new load, like a full electrical panel or heating that won't reach. All three show up after the money is spent if nobody looks first. We flash and check the roof joint before the inside is closed and set the floor height from the existing house.

What happens if an addition is built without a permit?

⌄
The jurisdiction can stop the work, fine you and make you open finished walls for inspection or take the addition down. It also follows the house. Unpermitted space tends to surface in a sale, an appraisal or an insurance claim, and legalizing it later means drawings, a permit application and opening walls so an inspector can see inside them. We build additions under permit.

Why do addition projects stall halfway through?

⌄
Most stall at a handoff: a failed inspection nobody scheduled the fix for, a decision still waiting on the homeowner, materials ordered late, or a contractor whose deposit ran out before the job did. The last one is the hardest to recover from. A written scope with payments tied to finished stages makes it less likely, because the money and the progress move together.

How do I avoid a contractor disappearing during an addition project?

⌄
Check the license before you sign, keep the deposit within the law, and tie every later payment to work you can see finished. In Maryland a home improvement contractor can't take more than one third of the contract price as a deposit. Get the scope, price and schedule in writing, and notice whether the contractor answers your messages during the estimate. Our estimate arrives by text with a link to approve it, so there's a written record from day one.

How do I check if a contractor is licensed to build additions in Washington DC?

⌄
Search the company on SCOUT, the DC Department of Licensing and Consumer Protection's lookup, by business name or license number. For an addition you want a Home Improvement Contractor or General Contractor license, and the electrician and plumber need their own DC trade licenses. Ours is Home Improvement Contractor License No. 420226000078, and we also hold a DC contractor license.

What should I look for in a home addition contractor's past work?

⌄
Look where the new work meets the old. The roof joint, the siding seam and the floor at the doorway are where a careless addition shows, so ask for photos of those spots. Ask whether each job was permitted and passed its final inspection. A freshly painted room tells you less than a flat threshold and a straight roofline.

What questions should I ask before hiring an addition contractor?

⌄
Who pulls the permit and books the inspections? Does the price include drawings, engineering and permit fees? What happens if opening the old wall turns up a problem? How are payments tied to progress? Who is on site each day, and what does the warranty cover? Get the answers in writing. Ours: we coordinate the permits, changes are priced and approved before they're built, and our labor carries a 60 to 90 day warranty, depending on the job.

Should a contractor give references for addition projects?

⌄
Yes, and ask for references from additions specifically, since a foundation, a roof tie-in and a permit are different work from a kitchen. When you call, ask whether the job finished on the schedule they were given and how surprises were handled. Our Google reviews are public, 5.0 from four reviews, and we give references on request.

My addition project was left unfinished by another contractor. Who can finish it?

⌄
We can, once we've walked it. First we find out what was built, whether the permit is still open and which inspections passed, because work covered up before inspection may have to be opened. Then you get a written scope and price for finishing. Bring the permit number, the drawings and the old contract to the walkthrough if you have them.

A storm damaged the part of my house I was adding onto. What do I do first?

⌄
Keep people clear of downed lines and call the utility if wires are involved. Get a tarp over open framing or roof, and photograph the damage before anything is moved. Then call your insurer, and the builder's risk carrier if the project has one. We don't run an emergency service. We answer 7 AM to 7 PM every day, and once the site is safe we document the damage and price the repair with the rest of the addition.