Kitchen Remodel: Sink Run, Island and New Flooring
A kitchen reworked around a new sink run under the window and a quartz-topped island, with the dishwasher, faucet and flooring all set as part of the same job.

What the job had to solve
Moving a sink run means moving supply and drain lines, and an island means getting services out to the middle of the floor. Both have to be right before the counters are templated, because nothing about a quartz top is adjustable afterwards.
Work performed
- Cabinet run set under the window, level and scribed
- Quartz counters and island top templated and installed
- Undermount sink and faucet set and connected
- Dishwasher installed and connected
- Wall and ceiling finish repaired and painted around the new layout
- Wood flooring run through the kitchen
Trades involved
CabinetryCountertopsPlumbingDrywallPaintingFlooring
How the work ran
- 1Confirm the layout and where services need to land, then rough in.
- 2Repair and finish the walls before cabinets go on them.
- 3Set the cabinet runs level, then template the counters off the installed cabinets.
- 4Install the counters, set the sink and faucet, and connect the appliances.
- 5Trim out, touch up the paint and lay the flooring.
The result
A kitchen that works the way it was laid out: sink under the window, island in the middle, and a floor that runs through without a threshold in the walkway.