Skip to main content
Property Damage or an Urgent Repair in MD, DC or VA? Call (240) 695-4415 to Confirm AvailabilityProperty Damage or an Urgent Repair in MD, DC or VA? Call (240) 695-4415 to Confirm AvailabilityProperty Damage or an Urgent Repair in MD, DC or VA? Call (240) 695-4415 to Confirm AvailabilityProperty Damage or an Urgent Repair in MD, DC or VA? Call (240) 695-4415 to Confirm Availability

After mitigation or demolition

Get a Written Post-Mitigation Reconstruction Scope

If mitigation or demolition left open walls, missing flooring, exposed framing, disconnected finishes, or an unusable room, APAS creates a written reconstruction plan to take the property from open damage to finished use.

Mitigation removed the damaged material. This written scope shows what it takes to rebuild the space and make it usable again.

$399-$699 · Credited 100% toward reconstruction work of $7,500+ booked within 30 days · Delivered in 2 to 3 business days after the site visit.

When this is the right document

The dry-out crew has packed up and left you with studs, subfloor and a room you cannot use.

Homeowners, landlords and property managers holding a mitigation invoice and no plan for the rebuild.

How this differs from a free estimate

Our estimates are free and always will be. An estimate prices work when the scope is already clear. This document is for when it is not: several problems, several trades, and no agreed order to do them in. You are paying for the walkthrough, the photo documentation and a written plan you keep.

The full report fee is credited toward APAS reconstruction work of $7,500 or more, booked within 30 days of delivery.

What you get

The deliverable is the Post-Mitigation Reconstruction Scope. Delivered in 2 to 3 business days after the site visit.

  • Visual walkthrough of accessible post-mitigation conditions
  • Review of your mitigation photos, dry-out documentation or existing damage notes
  • 25 to 50 labeled site photos
  • Written rebuild scope by room or affected area
  • Reconstruction sequence covering drywall, framing, flooring, paint, roof-repair coordination, electrical, HVAC coordination and remodeling items when applicable
  • A clear list of visible work included, excluded and pending verification
  • An APAS rebuild budget range and projected phase plan
  • Optional add-on: a line-item detailed estimate once the scope is approved

Pricing

Pick the tier that matches the property. If you are not sure, send photos first and we will tell you which one fits before you pay anything.

$399

One affected floor or standard reconstruction area

$699

Multiple rooms or multi-trade reconstruction

The fee comes back if you hire us

The full report fee is credited toward APAS reconstruction work of $7,500 or more, booked within 30 days of delivery.

How it works

  1. 1Send your mitigation paperwork, dry-out documentation or photos, and we confirm the property is ready for reconstruction planning.
  2. 2We invoice for the tier that matches the affected area and schedule the visit.
  3. 3We walk the exposed areas, document what was removed and photograph the current condition.
  4. 4You receive the written reconstruction scope in 2 to 3 business days.
  5. 5If you hire us for the rebuild within 30 days, the full fee comes off the project.

Start your Post-Mitigation Reconstruction Scope

Send the details and any photos you already have. We confirm the tier that fits, send an invoice, and schedule the visit. Nothing is charged until we have confirmed the document is right for your property.

Prefer to talk it through?

(240) 695-4415

We answer every day, 7:00 AM to 7:00 PM. For active property damage, emergency response is available 24/7.

All Purpose Anytime Services
6965 Heather Drive, Suite A, Bryans Road, MD 20616

Up to 6 files, 5 MB each.

No payment is taken on this form. We confirm the scope and send an invoice first.

What this document is not

  • ·It is not mitigation or drying. If the property is still wet, call us for emergency response first.
  • ·It is not an insurance coverage determination, and we are not public adjusters. We document the construction scope; your carrier decides coverage.

Scope limitation: This document is a visual repair-planning report based on accessible conditions observed during the site visit and information provided by the customer. It is not an engineering report, laboratory test, insurance coverage determination, code-compliance certification, structural evaluation, or guarantee that hidden conditions do not exist. Additional work may be required if concealed conditions are discovered after work begins.

Questions about the Post-Mitigation Reconstruction Scope

My mitigation company already gave me paperwork. Why do I need this?
Mitigation paperwork documents what was removed and dried. It does not tell you what it costs and takes to put the building back. This scope covers the rebuild: framing, drywall, flooring, paint, and the trade sequence to get the room usable again.
Do I get the fee back?
Yes, in full, against APAS reconstruction work of $7,500 or more booked within 30 days of delivery.
Can you work from my insurance estimate?
We will read it and account for it. We document the construction scope we observe and where it differs from what has been written, so you can take a clear position. We are a reconstruction contractor, not a public adjuster, so we do not negotiate the claim itself.
Can I get a line-item estimate instead of a range?
Yes, as an add-on once the scope is approved. The scope establishes what is being rebuilt; the line-item estimate prices it in detail.