How long does a remodel take?
Less time than most people expect on site, and more time than most people expect overall. The construction itself is usually the shorter half. Permits, inspections, material lead times and decisions waiting on the homeowner are what stretch a project, and only one of those is under the contractor.
Where the time actually goes
Demolition is fast. Framing is fast. Drywall is not fast, because finishing needs coats and coats need to dry, and rushing that is how you get seams that show a year later. Tile needs setting time before grout. Paint needs the surface to be ready before it is worth putting on.
Between those there are inspections. Rough inspections have to pass before anything gets closed up, and an inspector who cannot come until Thursday stops the job until Thursday regardless of who is standing there.
The two things that stretch a job most
Selections not made. A kitchen cannot be finished around a cabinet decision that has not happened, and a tile that gets chosen in week three is a tile that arrives in week six. Every day a decision sits open is usually a day added to the end.
Long lead items ordered late. Cabinets, windows, custom doors and some appliances have lead times measured in weeks or months. Ordering those at the start, before demolition, is the single biggest thing that keeps a project on schedule.
What a real schedule looks like
A schedule should be built backwards from a completion date, with the trades in sequence and the long lead items ordered at the front. It should name the points where you have to decide something, with a date attached.
We do not publish typical durations by project type, because a bathroom in a slab ranch and a bathroom on the third floor of a rowhouse with a shared wall are not the same project. You get a schedule for your job with the sequence in it.
Living in it while it happens
For a single room, containment and daily cleanup make it liveable. For a kitchen, plan for the stretch with no kitchen and set up somewhere to cook before demolition rather than during it.
On occupied work we phase the noisy scopes and keep a path through the house. Commercial jobs get the same treatment, run after hours where the business has to keep trading.